Yorktown Pumping Station
Savin Engineers provided design, shop drawing review and construction inspection services for all structural components of the Hunterbrook Wastewater Pumping Station project in the Town of Yorktown, New York. The structure consisted of a 30 foot deep by 50 feet long by 30 foot wide reinforced concrete substructure with a masonry superstructure. Design included all aspects of a large dry/wet well type pumping station in accordance with American Concrete Institute Codes, ACI 318. |
Owner: Town of Yorktown Location: Yorktown, NY Cost: $3 million Project Type: Structural Water/Wastewater Services Rendered: Assessments Commissioning Construction Management Design Engineering Field Services Planning Program Management |