Back to list
Brooklyn Battery Parking Garage

The Brooklyn Battery Parking Garage was completed in 1950 when the tunnel opened. Owned and operated by the Metropolitan Transit Authority (MTA), a $44 million makeover was undertaken. Savin Engineers provided construction management and inspection services that included the onsite investigation of the “Structural Rehabilitation of the Battery Parking Garage” including: structural demolition and replacement of reinforced concrete members, removal and replacement of the storm drainage system, installation of a new electrical system, and the application of waterproofing membrane. Savin also supervised the installation and painting of new concrete masonry unit block walls, and was responsible for ensuring that all project activities were in full compliance with specifications, contract drawings, submittals, as well as QA/QC and OSHA requirements.


Owner: Triborough Bridge & Tunnel Authority

Location: New York, NY

Cost: $44 million

Project Type:
Transportation
Services Rendered:
Assessments
Commissioning
Construction Management
Design
Engineering
Field Services
Operations
Planning
Program Management
Powered by Sigsiu.NET RSS Feeds